.jpg) end caps welded on,, thermal plastic system
|
|
|
.jpg) 2026 all new pipe
|
.jpg) the well head needs pulling and upgrading.
|
.jpg) pulling out 50 feet of pipe here is not easy. there is hatch on top to allow that seen here
|
|
.jpg) depth of well is 50 Feet. (15 meters), I guess is 100% drilled into solid rock.
|