New doors inside

Project 1st floor all interier doors install x6, and bunk beds
knobs and materesses
Mattereses
loading
loaded
ready to roll , on the move to Campo
Door frames are in kits. (sticks)
Arrival down 1st floor, front door.
see new doors waiting
bed mattresses for 2bunk beds.
sanded ready to paint.
Low pressure spray gun,
Framed up. for bath room.
kitchen east end looking easy
Page 1 of 2