.jpg) Wired and done , last photo first.
|
2ndflr-electrics1.jpg) Begin 2nd floor load center CB panel.
|
|
|
.jpg) LOAD CENTER 2n floor done. with breakers and GFI
|
 the hardwork is here, adding missing conduit. (before tile underlayment happens)
|
|
|
.jpg) 2nd floor wired and done.
|
.jpg) 2nd floor MBR1, bath, with port hole and ready for tile floor and all walls
|