Wired and done , last photo first.
Begin 2nd floor load center CB panel.
LOAD CENTER 2n floor done. with breakers and GFI
the hardwork is here, adding missing conduit. (before tile underlayment happens)
2nd floor wired and done.
2nd floor MBR1, bath, with port hole and ready for tile floor and all walls
2nd floor MBR2, bath, ready for tile on walls and floor.
The view from our lake.